Unit VI Case Study

Stuck with a difficult assignment? No time to get your paper done? Feeling confused? If you’re looking for reliable and timely help for assignments, you’ve come to the right place. We promise 100% original, plagiarism-free papers custom-written for you. Yes, we write every assignment from scratch and it’s solely custom-made for you.


Order a Similar Paper Order a Different Paper

The standards in Subpart S are consistently in the top 10 in OSHA’s most frequently cited standards lists and highest

penalties assessed lists. The standards in Subpart S are complex and often misunderstood—even by professional

electricians.

Use the checklist here –

(see attachment)

to conduct an electrical safety inspection of your workplace. Add the citation for the OSHA standard

for each question. In the comments section for each item, include your recommendations for correcting the violations. If a

checklist item does not apply to your organization, explain why in the comments. In the summary section at the end of the

checklist, discuss the significance of any noncompliance you found, and identify the types of injuries that might result if the

violations are left uncorrected.

If you did not find any noncompliance, discuss what your organization does to prevent electrical safety violations and

electrical injuries. Compile the checklist information into a report that outlines the major issues, if any, found in your

workplace.

The case study should be a minimum of two pages in length (double-spaced), including the completed checklist. The report

must follow APA guidelines for formatting, and the report must include a title page and reference page.

Unit VI Case Study
UNIT VI ASSIGNMENT: ELECTRICAL SAFETY INSPECTION STUDENT NAME: DATE: QUESTION YES NO OSHA STANDARD COMMENT 1 Are portable electrical tools and equi pment grounded or of the double -insulated type? 1910.304(g)(6)(vi)(C)(3) 1910.304(g)(6)(vii)(B) 2 Are electrical appliances (e.g., vacuum cleaners, polishers, vending machines ) grounded? 1910.304(g)(6)(iii) 3 Are exposed wiring and cords with frayed or deteriorated insulation repaired or replaced promptly? 1910.305(a)(2)(x) 4 Are flexible cords and cables free of splices or taps? 1910.305(g)(2)(ii) 5 In wet or damp locations, are electrical tools and equipment appropriate for the use or location or otherwise protected? 1910.304(g)(6)(vi)(C)(7) 6 Are all disconnecting switches and circuit breakers labeled to indicate their use or equipment served? 1910.303(f)(2) 7 Are all energized parts of electrical circuits and equipment guarded against accidental contact by approved cabinets or enclosures? 1910.303(g)(2)(i) 8 Is sufficient access and working space provided and maintained around all electrical equipment to permit ready and safe operations and maintenance? 1910.303(g)(1)(i) UNIT VI ASSIGNMENT: ELECTRICAL SAFETY INSPECTION 9 Are all unused openings (including conduit knockouts) in electrical enclosures and fittings closed with appropriate covers, plugs, or plates? 1910.305(b)(1)(ii) 10 Are electrical enclosures (e.g., switches, receptacles, junction boxes ) provided with tight -fitting covers or plates? 1910.305(b)(2)(i) SUMMARY:

Writerbay.net

We’ve proficient writers who can handle both short and long papers, be they academic or non-academic papers, on topics ranging from soup to nuts (both literally and as the saying goes, if you know what we mean). We know how much you care about your grades and academic success. That's why we ensure the highest quality for your assignment. We're ready to help you even in the most critical situation. We're the perfect solution for all your writing needs.

Get a 15% discount on your order using the following coupon code SAVE15


Order a Similar Paper Order a Different Paper